Geel
- Production floor capacity +/- 23.000 m²
- Diameter 10 m
- Max. length 80 m
- Max. weight 1.000 tons
- Total capacity +/- 75.000 mh/y
- Furnace 18 x 9 x 10 m
- Furnace 19 x 12 x 13 m
factory
Genk
- Production floor capacity +/- 23.000 m²
- Diameter 10 m
- Max. length 100 m
- Max. weight 1.000 tons
- Total capacity +/- 75.000 mh/y
- Furnace 18 x 9 x 10 m
- Furnace 19 x 12 x 13 m
Machinery
At Coek Engineering, our commitment to excellence is reflected not only in our people and expertise, but also in our advanced machinery. Over the years, we have invested in a wide range of dedicated — and in some cases custom-built — equipment specifically designed for the processing and fabrication of clad materials. These machines allow us to handle complex manufacturing steps with unmatched precision and efficiency.
By performing the majority of critical operations fully in-house — including forming, welding, heat treatment, and machining — we maintain complete control over every stage of production. This integrated approach ensures the highest levels of quality, reliability, and traceability, particularly in the fabrication of clad equipment for critical applications. Our tailored infrastructure empowers us to meet the strictest industry standards while maintaining the flexibility to adapt to project-specific needs.